Directions for Use:

1. Shake can well before using. Recommended operating temperatures range from 60 degrees F to 100 degrees F.

2. Hold can 6 - 8 inches from the target surface and apply a uniform coat.

3. Manually link (push together) materials while InfuZene is still tacky.

Note: For extra strength, spray both surfaces and allow a minimum of 2 minutes drying time before assembly.

5405 Constance Dr. SW * Port Orchard, WA 98367
Tel: 360-674-2051 * Fax: 360-674-2053 * Toll Free: 877-674-2010
www.infuzene.com * sales@infuzene.com

 

FREE counter and Web statistics from sitetracker.com